Mahler Water Reclamation Facility Improvements Project Phase 1

Bid/RFP Status: 
Closed - no longer accepting bids and proposals
Bid/RFP Due Date: 
Thursday, September 22, 2022 - 2:00pm

The City of Sweet Home hereby invites pre-qualified firms to submit bids for construction of the Mahler Water Reclamation Facility Improvements Project Phase 1 as an independent contractor to the City.  Construction includes an influent pump station, main electrical building and EIC panels, civil site work, and demolition of abandoned structures.  The engineer's estimate is $6.4M.

Sealed bids will be due at Public Works at 2:00pm on Wednesday, September 14, 2022 (Modified by Addendum 1 - Please verify).   Bidders are directed to the solicitation document(s) below for detailed information and submittal requirements. Interested subcontractors are directed to the SOPQ Notice of Pre-Qualification Determinations, below.

8-19-2022 Corrected the attached files after receiving notification that the Volume 1 Specs file was actually a duplicate of the Supplementary Info.

8-25-2022 Added pre-bid meeting sign-in sheet and site asbestos test report.

8-30-2022 Posted Addendum 1.

9-7-2022 Posted Addendum 2.

9-13-2022 Added reference library WWTP asbuilt files.

9-16-2022 Posted Addendum 3.

9-22-2022 Posted bid opening results.

10-21-2022 Posted Notice of Cancellation.